Estimate levelling compound for multiple areas

Add one area per room or average layer thickness. Avoid averaging visibly uneven rooms into a misleading single depth.

Areas and thickness

Product usage and bag size

Check substrate, primer, permitted thickness and mixing water in the technical data sheet. This estimates material only; it does not approve installation suitability.

How to calculate self-levelling compound for several floor areas

Enter each room area and average thickness, the product-specific usage in kg per m² per mm, allowance, bag weight, and optionally price and stated minimum or maximum thickness. Get base weight, whole bags, purchasing surplus, geometric litres and area-weighted average layer depth, with a per-area breakdown.

Example: 18 m² at 5 mm plus 8 m² at 9 mm, with 1.6 kg/m²/mm: (18×5+8×9)×1.6 = 259.2 kg base, 272.16 kg with 5% allowance, which is 11 bags of 25 kg.

Results are estimates and depend on the supplied values.

How many bags of self-levelling compound do I need?

1. Measure each area separately

Enter measured square metres and realistic average thickness in millimetres for each room or zone.

Volume per zone (L) = area (m²) × average thickness (mm)

2. Use your product consumption figure

Technical sheets commonly report kilograms per m² and millimetre. Do not treat different self-levelling products as identical.

Base kg = Σ(area × thickness × product usage)

3. Round up to bags

Add an explicit purchasing allowance, divide by your real bag size and round up to whole bags.

bags = ceiling(base kg × (1 + allowance/100) / bag kg)

4. Check the product thickness range

Some materials are intended for thin layers while others are thicker screeds. Optionally enter the manufacturer-approved thickness limits.

No product-wide thickness limit is assumed.
Limitations

Does not determine mixing-water quantity, primer, drying time, structural suitability or a suitable product. Incorrect average thickness measurements can materially affect required mass. Geometric litres must not be treated as water needed for mixing.

Frequently asked questions

How many bags of self-levelling compound do I need?

Multiply area by average thickness and the product-specific kg/m²/mm rate; add allowance and round up bags.

What if rooms have different thickness?

Enter areas separately; the calculator adds weights and finds an area-weighted average thickness.

What does kg/m²/mm mean?

Kilograms of dry compound required approximately per square metre and millimetre of placed layer.

Is 1.6 kg/m²/mm a universal value?

No. It is an editable example and products have different consumption rates.

Are calculated litres the mixing water?

No. They express geometric layer volume. Follow the product data sheet for mixing water.

Can I include the price per bag?

Yes. Optional price is multiplied by the number of whole bags.

How can I add a room in the middle?

Use Add area or Insert above, which preserves existing input values.

Can I apply any depth?

No. Follow manufacturer minimum and maximum thickness and substrate requirements.